POWER SUPPLY GUIDELINES FOR MAJOR PROJECTS
2018-2-5u2002·u2002Exclusively 11kV corridor of 7m (2x2.5m + 2m gap) width to be provided at two adjacent sides of 132/11kV substations up to the roads. Exclusive 11kV corridors of 2.5m width to be provided on both sides of the road around the 132/11kV substations. A single …